Extending the Operational Life of the International Space Station (ISS) Until 2024 - Overly Optimistic Cost Projections, Technical Risks and Issues, Human Health Issues, Cargo Transport, Solar Panels

Nonfiction, Science & Nature, Technology, Aeronautics & Astronautics, Science, Physics, Astrophysics & Space Science
Cover of the book Extending the Operational Life of the International Space Station (ISS) Until 2024 - Overly Optimistic Cost Projections, Technical Risks and Issues, Human Health Issues, Cargo Transport, Solar Panels by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781311742872
Publisher: Progressive Management Publication: October 7, 2014
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781311742872
Publisher: Progressive Management
Publication: October 7, 2014
Imprint: Smashwords Edition
Language: English

This recently released audit report of the NASA Office of Inspector General provides unique information about the challenges facing NASA as it hopes to extend the life of the International Space Station (ISS) through 2024.

Results - We found that while NASA has identified no major obstacles to extending ISS operations to 2024, it must address several areas of risk to ensure continued safe operations. In addition, NASA projects its annual budget for the ISS Program to grow from $3 billion in FY 2014 to nearly $4 billion by FY 2020. However, with a 26 percent cost increase between FYs 2011 and 2013 and an average increase of 8 percent annually over the life of the Program, we believe the assumptions underlying NASA's cost projections are overly optimistic and result in an understated projection of out-year expenses. Third, while utilization of the ISS for research continues to increase, NASA and CASIS continue to face challenges to maximizing its research capabilities.

NASA Has Not Identified Major Obstacles to Extending ISS Operations to 2024 But Several Risks Require Mitigation. NASA continues to assess the long-term viability of the ISS and to date has identified no major obstacles to extending operations to 2024. Nevertheless, the Agency must address several risks. First, the ISS faces a risk of insufficient power generation due in part to faster than expected degradation of its solar arrays. Second, although most replacement parts have proven more reliable than expected, sudden failures of key hardware have occurred requiring unplanned space walks to repair or replace hardware. Third, although NASA has a robust cargo transportation system, it has a limited capacity to transport large replacement parts - such as solar arrays and radiators - to the Station. While the ISS Program is actively working to mitigate these risks, anticipating the correct number and type of replacement parts and transporting them to the ISS present major challenges to extending operations 10 or more years beyond the Station's original expected service life. Additionally, the Program may have to augment the Station's power generating capability due to continued degradation of the solar arrays.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

This recently released audit report of the NASA Office of Inspector General provides unique information about the challenges facing NASA as it hopes to extend the life of the International Space Station (ISS) through 2024.

Results - We found that while NASA has identified no major obstacles to extending ISS operations to 2024, it must address several areas of risk to ensure continued safe operations. In addition, NASA projects its annual budget for the ISS Program to grow from $3 billion in FY 2014 to nearly $4 billion by FY 2020. However, with a 26 percent cost increase between FYs 2011 and 2013 and an average increase of 8 percent annually over the life of the Program, we believe the assumptions underlying NASA's cost projections are overly optimistic and result in an understated projection of out-year expenses. Third, while utilization of the ISS for research continues to increase, NASA and CASIS continue to face challenges to maximizing its research capabilities.

NASA Has Not Identified Major Obstacles to Extending ISS Operations to 2024 But Several Risks Require Mitigation. NASA continues to assess the long-term viability of the ISS and to date has identified no major obstacles to extending operations to 2024. Nevertheless, the Agency must address several risks. First, the ISS faces a risk of insufficient power generation due in part to faster than expected degradation of its solar arrays. Second, although most replacement parts have proven more reliable than expected, sudden failures of key hardware have occurred requiring unplanned space walks to repair or replace hardware. Third, although NASA has a robust cargo transportation system, it has a limited capacity to transport large replacement parts - such as solar arrays and radiators - to the Station. While the ISS Program is actively working to mitigate these risks, anticipating the correct number and type of replacement parts and transporting them to the ISS present major challenges to extending operations 10 or more years beyond the Station's original expected service life. Additionally, the Program may have to augment the Station's power generating capability due to continued degradation of the solar arrays.

More books from Progressive Management

Cover of the book Roadside Bombs and Improvised Explosive Devices (IEDs) - America's Effort to Target and Defeat Homemade Explosives in Afghanistan and Iraq - Electronics, Surveillance, Dogs, and More by Progressive Management
Cover of the book 2016 Russia: Background and Strategy - Vladimir Putin, Ukraine, Sanctions, Economic Troubles, Russian Military Reform, Defense Spending, Readiness, Demographics, Moving on From the Cold War by Progressive Management
Cover of the book Strategic Air Warfare: An Interview with Generals Curtis E. LeMay, Leon W. Johnson, David A. Burchinal, and Jack J. Catton - World War II, Strategic Air Command SAC, Korean War, Southeast Asia by Progressive Management
Cover of the book Issues of Battlefield Ethics and Leadership: Discussion Material for Small Unit Leaders, Rules of Conduct for Marines - Torture, POW and Civilian Treatment, Law of War, Care for Wounded, Property by Progressive Management
Cover of the book Apollo and America's Moon Landing Program: Apollo 16 Official NASA Mission Reports and Press Kit - 1972 Fifth Lunar Landing at Descartes - Astronauts Young, Mattingly, and Duke by Progressive Management
Cover of the book Encyclopedia of NASA Lessons Learned (Part 5): Thousands of Aerospace Technology Engineering Reports, Problems, Accidents, Mishaps, Ideas and Solutions - Space Shuttle, Spacecraft, Rockets, Aircraft by Progressive Management
Cover of the book Counterinsurgency in Somalia: Lessons Learned from the African Union Mission in Somalia, 2007-2013 - Insurgents, Harakat al-Shabaab, Somali Piracy, Evolution of AMISOM, U.S. Role, Lessons Learned by Progressive Management
Cover of the book A New Beginning: Speech by President Barack Obama in Cairo, Egypt, June 2009 - Islam, Muslims, Finding Common Ground in the Middle East - plus American Response to Egyptian Uprising by Progressive Management
Cover of the book National Aeronautics Research and Development Plan and Development, Test and Evaluation (RDT&E) Infrastructure Plan - Air Traffic, Unmanned Aircraft Systems (UAS), NAS, Hypersonic Flight, Safety by Progressive Management
Cover of the book Air Power History from Infancy, World Wars, to the Present, Pioneers, USAF and Foreign Air Forces: A Companion for Aspirant Air Warriors: A Handbook for Personal Professional Study by Progressive Management
Cover of the book Partners in Freedom: Contributions of the Langley Research Center to U. S. Military Aircraft of the 1990s - Harrier, C-17, F/A-18, A-10, F-111, A-6, EA-6B, F-14, X-29, C-130, F-16, F-22, F-15, B-2 by Progressive Management
Cover of the book An Analysis of the FARC in Colombia: Breaking the Frame of FM 3-24 - From the Beginnings of the FARC to the Present, Guerrilla Insurgency, Doctrinal Gaps, Summary of Narrative and Strategy by Progressive Management
Cover of the book Questions and Answers About Swine Flu: 2009 H1N1 Pandemic Influenza - Medical Data with Information on Symptoms, Treatment, Vaccine Safety and Drugs by Progressive Management
Cover of the book 21st Century Ultimate Guide to Radiological Dispersal Device (RDD) Dirty Bomb Attack Preparedness and Response: Personal and Medical Response, Radioactive Illness, Radiation Injuries, Decontamination by Progressive Management
Cover of the book Gulf War Logistics: Theory Into Practice - Desert Shield and Storm, Army Logistics from Vietnam to AirLand Battle, Ramifications of Schwarzkopf's Decision, Tactical Airlift, Ground Transportation by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy