Skylab Mission Report: Second Visit - 1973 Space Station Mission by Bean, Garriott, and Lousma, Mission Activities, Hardware, Anomalies, Science Experiments, Crew Health, EVAs

Nonfiction, Science & Nature, Technology, Aeronautics & Astronautics, Science, Physics, Astrophysics & Space Science
Cover of the book Skylab Mission Report: Second Visit - 1973 Space Station Mission by Bean, Garriott, and Lousma, Mission Activities, Hardware, Anomalies, Science Experiments, Crew Health, EVAs by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781476295763
Publisher: Progressive Management Publication: May 18, 2012
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781476295763
Publisher: Progressive Management
Publication: May 18, 2012
Imprint: Smashwords Edition
Language: English

This official NASA internal document - converted for accurate flowing-text ebook format reproduction - is a comprehensive evaluation of the operational and engineering aspects of the second manned visit to the Skylab space station and includes the performance of experiment hardware that is under Johnson Space Center management; the crew's evaluation of the visit; and other visit-related items of interest such as medical aspects and hardware anomalies.

The space vehicle, consisting of a modified Apollo command and service module payload on a Saturn IB launch vehicle, was inserted into a 231.3 by 154.7 kilometer orbit. Rendezvous maneuvers were performed during the first five orbits as planned. During the rendezvous, the command and service module reaction control system forward firing engine (quad B) oxidizer valve leaked. The quad was isolated. Stationkeeping with the Saturn Workshop began approximately 8 hours after lift-off with docking being performed about 30 minutes later.

The crewmen experienced motion sickness during the first three visit days. Consequently, the Saturn Workshop activation and experiment implementation activities were curtailed. By adjusting the crew's diet and maintaining a low work load, the crew was able to complete the adjustment to space flight in 5 days, after which the flight activities were returned to normal.

The first extravehicular activity was delayed to visit day 10 because of the crew's motion sickness. The extravehicular activity lasted almost 6.5 hours during which time the crew changed the Apollo Telescope Mount film, deployed the twin-pole sun shield, inspected and performed repair work on the S055 (Ultraviolet Spectrometer) experiment, deployed the S149 (Particle Collection) experiment, and installed the calibration shield from experiment S230 (Magnetospheric Particle Composition). A second extravehicular activity was performed on visit day 28 and lasted 4 hours and 30 minutes. A third extravehicular activity was accomplished on visit day 57 with a duration of 2 hours and 45 minutes to retrieve the expended film on the Apollo Telescope Mount solar experiments and experiments S230 and S149. Earth Resources Experiment Package activities included 39 passes with a total of 930 minutes of data. All experiment coverage was normal with the exception of the loss of experiment S193 (Microwave Radiometer/Scatterometer and Altimeter) when the antenna failed to operate during data pass 29. A series of medical experiments was accomplished which assessed the effect of a 59-day duration space mission on the crewmen. Included were a hematology and immunology program, a mineral balance assessment, an evaluation of the changes in hormonal and associated fluid and electrolyte parameters, the extent of bone mineral loss, the cardiovascular effects utilizing the lower body negative pressure experiment and the vectorcardiogram, and an assessment of the metabolic activity.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

This official NASA internal document - converted for accurate flowing-text ebook format reproduction - is a comprehensive evaluation of the operational and engineering aspects of the second manned visit to the Skylab space station and includes the performance of experiment hardware that is under Johnson Space Center management; the crew's evaluation of the visit; and other visit-related items of interest such as medical aspects and hardware anomalies.

The space vehicle, consisting of a modified Apollo command and service module payload on a Saturn IB launch vehicle, was inserted into a 231.3 by 154.7 kilometer orbit. Rendezvous maneuvers were performed during the first five orbits as planned. During the rendezvous, the command and service module reaction control system forward firing engine (quad B) oxidizer valve leaked. The quad was isolated. Stationkeeping with the Saturn Workshop began approximately 8 hours after lift-off with docking being performed about 30 minutes later.

The crewmen experienced motion sickness during the first three visit days. Consequently, the Saturn Workshop activation and experiment implementation activities were curtailed. By adjusting the crew's diet and maintaining a low work load, the crew was able to complete the adjustment to space flight in 5 days, after which the flight activities were returned to normal.

The first extravehicular activity was delayed to visit day 10 because of the crew's motion sickness. The extravehicular activity lasted almost 6.5 hours during which time the crew changed the Apollo Telescope Mount film, deployed the twin-pole sun shield, inspected and performed repair work on the S055 (Ultraviolet Spectrometer) experiment, deployed the S149 (Particle Collection) experiment, and installed the calibration shield from experiment S230 (Magnetospheric Particle Composition). A second extravehicular activity was performed on visit day 28 and lasted 4 hours and 30 minutes. A third extravehicular activity was accomplished on visit day 57 with a duration of 2 hours and 45 minutes to retrieve the expended film on the Apollo Telescope Mount solar experiments and experiments S230 and S149. Earth Resources Experiment Package activities included 39 passes with a total of 930 minutes of data. All experiment coverage was normal with the exception of the loss of experiment S193 (Microwave Radiometer/Scatterometer and Altimeter) when the antenna failed to operate during data pass 29. A series of medical experiments was accomplished which assessed the effect of a 59-day duration space mission on the crewmen. Included were a hematology and immunology program, a mineral balance assessment, an evaluation of the changes in hormonal and associated fluid and electrolyte parameters, the extent of bone mineral loss, the cardiovascular effects utilizing the lower body negative pressure experiment and the vectorcardiogram, and an assessment of the metabolic activity.

More books from Progressive Management

Cover of the book 21st Century Down Syndrome (Trisomy 21) Sourcebook: Clinical Data for Patients, Families, and Physicians, including Signs, Symptoms, Diagnosis, Genetics, Chromosome Anomalies by Progressive Management
Cover of the book Lessons from Fukushima: Relocation and Recovery from Nuclear Catastrophe - Radiological, Chernobyl, Risk Communication, Public Information, Property Compensation, Radiation Dose Range, Dosimeters by Progressive Management
Cover of the book Marines in the Korean War Commemorative Series: Outpost War - U.S. Marines from the Nevada Battles to the Armistice by Progressive Management
Cover of the book 21st Century Guide to Carbon Sequestration: Capture and Storage to Fight Global Warming and Control Greenhouse Gases, Carbon Dioxide, Coal Power, Technology Roadmap and Program Plan by Progressive Management
Cover of the book America's Space Shuttle: Electrical Power System NASA Astronaut Training Manual (EPS 2102) by Progressive Management
Cover of the book 21st Century Ankylosing Spondylitis (AS) Sourcebook: Clinical Data for Patients, Families, and Physicians - Seronegative Spondyloarthropathy, Arthritis, Back Pain, Sacroiliitis, Related Conditions by Progressive Management
Cover of the book Apollo and America's Moon Landing Program: Apollo 11 Official NASA Mission Reports and Press Kit by Progressive Management
Cover of the book Incident Response Pocket Guide and Wildland Urban Interface Wildfire Mitigation Desk Reference Guide: All-Hazard Response, Homeowner Fire Mitigation, Firewise Communities, Living with Fire by Progressive Management
Cover of the book Arctic Operations and the Northwest Passage: Department of Defense (DOD) Report to Congress on the Effect of Climate Change, Arctic Warming, National Security, Infrastructure, Icebreakers by Progressive Management
Cover of the book Marines in the Korean War Commemorative Series: Frozen Chosin - U.S. Marines at the Changjin Reservoir by Progressive Management
Cover of the book 21st Century End Stage Renal Disease and Kidney Failure Sourcebook: Clinical Data for Patients, Families, and Physicians - Chronic Kidney Disease (CKD), Glomerulonephritis, Dialysis, Transplant by Progressive Management
Cover of the book Culture Wars: Air Force Culture and Civil - Military Relations - USAF History on Dealing with National Policy, Case Studies of Operation Desert Storm and Northern/Southern Watch, Decade of Quasi-War by Progressive Management
Cover of the book 21st Century U.S. Military Law of War Deskbook: JAG Textbook on History and Framework of Law of War, Legal Bases for Use of Force, Geneva Conventions, War Crimes, Human Rights, Comparative Law by Progressive Management
Cover of the book 21st Century West Nile Virus (WNV) Sourcebook: Clinical Data for Patients, Families, and Physicians, including Symptoms, Prevention, Risk Groups, Mosquito Control Issues, Birds and Animals Affected by Progressive Management
Cover of the book The Efficacy of Cognitive Shock: Systemic Cognitive Fragmentation, Void Between Perceived and Presented, Reality as Perception, Mental Voids, Byproducts of Surprise, Deception, Strategic Paralysis by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy