Space Shuttle NASA Mission Reports: STS-4, STS-5, and STS-6 Missions in 1982 and 1983 - Complete Technical Details of Orbiter Performance and Problems

Nonfiction, Science & Nature, Science, Physics, Astronomy, History, Americas
Cover of the book Space Shuttle NASA Mission Reports: STS-4, STS-5, and STS-6 Missions in 1982 and 1983 - Complete Technical Details of Orbiter Performance and Problems by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781465830647
Publisher: Progressive Management Publication: December 22, 2011
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781465830647
Publisher: Progressive Management
Publication: December 22, 2011
Imprint: Smashwords Edition
Language: English

These official final orbiter mission reports issued by the NASA Johnson Space Center cover three missions in 1982 and 1983: STS-4, STS-5, and STS-6. In these thorough reports, with information and specifics not available on NASA website mission descriptions, each orbiter system is reviewed in detail along with technical information on performance and anomalies.

STS-4: The successful STS-4 mission was flown as planned with the launch on June 27, 1982, and the landing on July 4, 1982. The crew for the fourth orbital flight test was Captain T. K. Mattingly, Commander, and Henry W. Hartsfield, Jr., Pilot. Major activities during the fourth orbital flight test included remote manipulator system operations with a 900-1b payload (Induced Environment Contamination Monitor). This flight also included the first Department of Defense payload (DOD 82-1). All of the Orbiter services required by the Payload Integration Plan, annexes, etc. were supplied as planned with one exception. The wiring harness between the crew cabin area and the GAS (GetAway Special) experiment was not satisfactory, but the crew were successful in working around this problem and activating the GAS experiment.

STS-5: The STS-5 mission was launched on November 11, 1982 at 12:18:59.997 G.m.t., and landed November 16, 1982 at Edwards AFB, CA. The crew for this first commercial satellite deployment mission was Vance D. Brand, Commander; Colonel Robert F. Overmyer, Pilot; and William B. Lenoir, Ph.D., and Joseph P. Allen IV, Ph.D., Mission Specialists. All DTO/DSO test objectives of the flight were successfully completed except for the extravehicular activity which was cancelled because of extravehicular mobility unit problems.

STS-6: The STS-6 flight was launched on April 04, 1983, at 18:30:00.016 G.m.t. (12:30 p.m. c.s.t.) and landed April 09, 1983, at Edwards AFB, CA. The crew was Paul J. Weitz, Commander; Col. Karol J. Bobko, Pilot; and F. Story Musgrave, M.D., and Donald H. Peterson, Mission Specialists. Fifty-one of the 53 test objectives were accomplished. The two objectives that were not accomplished were DTO 0755 (autoland to 5000 ft) and DTO 0805 (crosswind landing performance). The ascent phase was normal in all aspects with all systems operating near predicted levels. The SRB (solid rocket booster) performance was satisfactory with the propellant burn rate about 0.2-percent lower than predicted. The action time was long by about 0.46 second on the right-hand motor and 0.96 second on the left-hand motor, resulting in SRB separation being delayed 0.75 second from predicted. All systems of the new lightweight ET (external tank) operated satisfactorily and the tank impacted only 5 nautical miles from the predicted point, well within the predicted footprint.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

These official final orbiter mission reports issued by the NASA Johnson Space Center cover three missions in 1982 and 1983: STS-4, STS-5, and STS-6. In these thorough reports, with information and specifics not available on NASA website mission descriptions, each orbiter system is reviewed in detail along with technical information on performance and anomalies.

STS-4: The successful STS-4 mission was flown as planned with the launch on June 27, 1982, and the landing on July 4, 1982. The crew for the fourth orbital flight test was Captain T. K. Mattingly, Commander, and Henry W. Hartsfield, Jr., Pilot. Major activities during the fourth orbital flight test included remote manipulator system operations with a 900-1b payload (Induced Environment Contamination Monitor). This flight also included the first Department of Defense payload (DOD 82-1). All of the Orbiter services required by the Payload Integration Plan, annexes, etc. were supplied as planned with one exception. The wiring harness between the crew cabin area and the GAS (GetAway Special) experiment was not satisfactory, but the crew were successful in working around this problem and activating the GAS experiment.

STS-5: The STS-5 mission was launched on November 11, 1982 at 12:18:59.997 G.m.t., and landed November 16, 1982 at Edwards AFB, CA. The crew for this first commercial satellite deployment mission was Vance D. Brand, Commander; Colonel Robert F. Overmyer, Pilot; and William B. Lenoir, Ph.D., and Joseph P. Allen IV, Ph.D., Mission Specialists. All DTO/DSO test objectives of the flight were successfully completed except for the extravehicular activity which was cancelled because of extravehicular mobility unit problems.

STS-6: The STS-6 flight was launched on April 04, 1983, at 18:30:00.016 G.m.t. (12:30 p.m. c.s.t.) and landed April 09, 1983, at Edwards AFB, CA. The crew was Paul J. Weitz, Commander; Col. Karol J. Bobko, Pilot; and F. Story Musgrave, M.D., and Donald H. Peterson, Mission Specialists. Fifty-one of the 53 test objectives were accomplished. The two objectives that were not accomplished were DTO 0755 (autoland to 5000 ft) and DTO 0805 (crosswind landing performance). The ascent phase was normal in all aspects with all systems operating near predicted levels. The SRB (solid rocket booster) performance was satisfactory with the propellant burn rate about 0.2-percent lower than predicted. The action time was long by about 0.46 second on the right-hand motor and 0.96 second on the left-hand motor, resulting in SRB separation being delayed 0.75 second from predicted. All systems of the new lightweight ET (external tank) operated satisfactorily and the tank impacted only 5 nautical miles from the predicted point, well within the predicted footprint.

More books from Progressive Management

Cover of the book A History of the Women Marines, 1946-1977: Legislation, Korean War, Pepper Board, Snell Committee, Recruit and Officer Training, Uniforms, Promotions, Marriage, Motherhood, Husbands by Progressive Management
Cover of the book The Office of Strategic Services (OSS) Model and the Future SOF Warrior - Joint Special Operations University Report of Proceedings - Selection Process, Organization, Resourcing by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: River-Crossing Operations - FM 90-13 (Value-Added Professional Format Series) by Progressive Management
Cover of the book Nuclear Navy 1946-1962: History of Navy's Nuclear Propulsion Program - Hyman Rickover, Nimitz, Nautilus, AEC, Nuclear Submarines, Reactors, Atoms for Peace, Thresher, Polaris Missile by Progressive Management
Cover of the book Apollo and America's Moon Landing Program: Apollo Meteoroid Shielding Design and Analysis at the Manned Spacecraft Center by Progressive Management
Cover of the book The Strategic Dimension of Chinese Engagement with Latin America: Commercial Activities in Strategic Sectors, Military Relationship, Organized Crime Ties, Triangle with America, Way Forward by Progressive Management
Cover of the book The United States Strategic Bombing Surveys: European War and Pacific War in World War II, Conventional Bombing and the Atomic Bombings of Hiroshima and Nagasaki by Progressive Management
Cover of the book 21st Century Textbooks of Military Medicine - Medical Aspects Of Biological Warfare - Anthrax, Ricin, Smallpox, Viral Fevers, Plague, Biosafety, Biosecurity (Emergency War Surgery Series) by Progressive Management
Cover of the book General George S. Patton: Operational Art, Battle Command Lessons in the Second World War, Leadership Development, Battle of the Bulge, Many Faces, Air Power for Patton's Army in World War II by Progressive Management
Cover of the book Kuwait in Perspective: Orientation Guide and Arabic Cultural Orientation: Geography, History, Economy, Security, al-Jahra, Persia, Iraq Invasion, Persian Gulf War, Bidoon, Mubarak the Great, Oil by Progressive Management
Cover of the book Joint Doctrine for Operations in Nuclear, Biological, and Chemical (NBC) Environments (Joint Publication 3-11) - Combat Operations, Health Service Support, Hazard Considerations by Progressive Management
Cover of the book Apollo and America's Moon Landing Program: Unconventional, Contrary, and Ugly: The Lunar Landing Research Vehicle (NASA SP-2004-4535) - Design and Development, LLTV, Armstrong by Progressive Management
Cover of the book Iraqi Perspectives Project: A View of Operation Iraqi Freedom from Saddam's Senior Leadership - Hussein's Distorted Worldview, Desert Storm, Regime Prepares for War, Baghdad Bob, Final Days by Progressive Management
Cover of the book Mach 3+: NASA/USAF YF-12 Flight Research, 1969-1979, Lockheed Blackbird Spyplanes as NASA/USAF Research Platforms (NASA SP-2001-4525) by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: Army Handbook for Self-Development - Strengths, Weaknesses, Roles, Responsibilities, Learning and Motivation, Roadblocks, Milestones (Professional Format Series) by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy